Liberty Commercial News
May 9, 2012 20:18:58
ATK Announces Complete Liberty System to Provide Commercial Crew Access
By Source: ATK

LOS ANGELES and ARLINGTON, Va., -- ATK (NYSE: ATK) announced today it has developed Liberty into a complete commercial crew transportation system, including the spacecraft, abort system, launch vehicle, and ground and mission operations, designed from inception to meet NASA's human-rating requirements with a potential for the first test flight in 2014 and Liberty crewed flight in 2015.

The company also announced Lockheed Martin (NYSE: LMT) will provide support to the ATK and Astrium Liberty team as a major subcontractor on the project.

"Our goal in providing Liberty is to build the safest and most robust system that provides the shortest time to operation using tested and proven human-rated components," said Kent Rominger, vice president and program manager for Liberty. "Liberty will give the U.S. a new launch capability with a robust business case and a schedule that we expect will have us flying crews in just three years, ending our dependence on Russia."

"Liberty will enable a successful commercial space program and result in a globally competitive capability that America doesn't have today," said Rominger. "This program is changing the way we do business and can also result in a positive change to government programs."

Liberty's test flights are expected to begin in 2014, with a crewed mission anticipated in late 2015. The current schedule will support crewed missions for NASA and other potential customers by 2016, with a price-per-seat that is projected to be lower than the cost on the Russian Soyuz rocket.

Liberty's approach is to bring together flight-proven elements designed from inception to meet NASA's human-rating requirement, reducing development time and costs, and providing known, reliable and safe systems. The simple configuration of a solid first stage and liquid second stage lowers the likelihood of failure and enables a flight path with total abort coverage, maximizing survival for the crew in the unlikely event of an anomaly requiring an abort. In addition, the Liberty spacecraft leverages design work performed at NASA Langley Research Center on the composite crew module and launch abort system, for which ATK was a contractor.

"Because Liberty provides a safe and reliable vehicle for the crew, as well as a sustainable business for years to come, it can be a successful commercial business," said Rominger. "Liberty's business case benefits from mature, flight-proven elements that dramatically lower our up-front development costs."

Liberty has a robust and sustainable business case that will create and sustain thousands of jobs across the United States including Alabama, California, Colorado, Florida, Maryland, New York, Ohio, Texas, Utah, and Virginia. Its low remaining development cost accelerates the time to market, filling NASA's requirements, and provides a quicker return on investment to outside entities. Liberty's performance of 44,500 pounds to low-earth orbit enables the system to launch both crew and cargo and also serve non-crewed markets including ISS cargo up and down mass, commercial space station servicing, U.S. government satellite launch, and future endeavors.

"We believe that no other offering can match Liberty's safety, spacious spacecraft, customer service and performance," said Rominger. "These traits enable the Liberty business to provide the best commercial space flight experience."

The Liberty spacecraft includes a composite crew module, which ATK built at its Iuka, Miss., facility as part of a NASA risk-reduction program at Langley between 2007 and 2010. As prime contractor, ATK is responsible for the composite crew module, Max Launch Abort System (MLAS), first stage, system integration and ground and mission operations, while Astrium provides the second stage powered by the Vulcain 2 engine and Lockheed Martin provides subsystems and other support.

"Astrium is proud to be part of the ATK Liberty team and to provide our proven second stage, which is powered by the Vulcain 2 engine, as an integral part of this exciting next-generation launch system," said John Schumacher, CEO of Astrium in North America, an EADS North America company. "Initially, we will ship the second stage to the Kennedy Space Center where it will be integrated by the skilled workforce there. However, once Liberty's business base is established in the U.S. market, we envisage Liberty upper stage manufacturing in the United States."

Lockheed Martin is providing crew interface systems design, subsystem selection, assembly, integration and mission operations support for the Liberty spacecraft. These subsystems could include avionics, guidance navigation and control, propulsion systems, environmental control system, docking system and other components.

"Combining Lockheed Martin's and ATK's decades of human spaceflight experience to create the Liberty space vehicle will help ensure America's crew access to the International Space Station – sooner rather than later," said Scott Norris, Lockheed Martin Lead, Liberty Program. "We look forward to our role supporting Liberty as it delivers on a highly-effective cost solution for NASA crew and for commercial missions."

The program has optimized and streamlined development, fabrication and mission operations while ensuring the utmost safety to support a commercial marketplace. Liberty also builds upon processes from existing ATK, Astrium and Lockheed Martin commercial programs. ATK's commercial programs include solid rocket motors for various launch vehicles, system integration and composite technology (for crew module, Delta IV, Atlas V and A350 Airbus composite structures) and other commercial products. Astrium builds the Ariane 5, which launches the majority of the world's commercial satellites and is afforded the lowest insurance rates based on its successful track record. Lockheed Martin commercial programs include satellites, the Atlas V and Athena launch vehicles.

"The team's combined best practices enable Liberty to offer affordable access to space, both to serve existing market needs and, critically, to spur the development of new markets that depend on affordable, safe access to space," said Rominger.

Liberty has been developed under a CCDEV-2 unfunded Space Act Agreement (SAA) with the NASA Commercial program office at the Kennedy Space Center.  All development to date has been performed on internal funding from ATK and Astrium. Under this SAA, the team has successfully completed four milestones. The next major milestone is a structural test of the second stage tank, to be conducted at Astrium in June.

"Working with the NASA team under the SAA has provided significant benefit to the development of the Liberty crew transportation system," said Rominger.

The Liberty team will be working with NASA centers to further leverage lessons learned, engineering expertise test, launch facilities and mission operations, including Kennedy, Johnson, Marshall, Langley, Glenn, Ames and Stennis. 

Additional subcontractors for Liberty include Safran/Snecma, which provides the Vulcain 2 engine; Safran/Labinal out of Salisbury, Md., which provides second stage wiring; L-3 Communications Cincinnati Electronics (L3-CE), which provides first stage, abort and telemetry system avionics, as well as second stage telemetry and abort system integration prior to launch at KSC; and Moog Inc. (NYSE: MOG.A and MOG.B), which provides thrust vector control and propulsion control.

The Liberty launch system uses components from both the US Space Shuttle program and ESA's Ariane V. Photo Credit: ATK

ATK is an aerospace, defense, and commercial products company with operations in 22 states, Puerto Rico, and internationally. News and information can be found on the Internet at www.atk.com.

Certain information discussed in this press release constitutes forward-looking statements as defined in the Private Securities Litigation Reform Act of 1995.  Although ATK believes that the expectations reflected in such forward-looking statements are based on reasonable assumptions, it can give no assurance that its expectations will be achieved.  Forward-looking information is subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected. Among those factors are: the challenges of developing new launch vehicles; changes in governmental spending, budgetary policies and product sourcing strategies; the company's competitive environment; the terms and timing of awards and contracts; and economic conditions.  ATK undertakes no obligation to update any forward-looking statements. For further information on factors that could impact ATK, and statements contained herein, please refer to ATK's most recent Annual Report on Form 10-K and any subsequent quarterly reports on Form 10-Q and current reports on Form 8-K filed with the U.S. Securities and Exchange Commission.

More Interactive Photography
Gale CratorInterActive First look crisp look around Gale Crator This 360-degree, full-resolution panorama from NASA's Curiosity rover shows the area all around...
Endeavour nose gear in OPFInterActive Endeavour nose gear in OPF This was shot from forward and underneath Space Shuttle Endeavour in the Orbiter Processing...
Endeavor engine compartmentInterActive Endeavor engine compartment View into the Space Shuttle's engine compartment with the three main engines removed.
Endeavor engine compartmentInterActive Endeavor engine compartment View into the Space Shuttle's engine compartment with the three main engines removed.
Endeavour Cargo BayInterActive Endeavour Cargo Bay This image was shot from the forward end of Space Shuttle Endeavour's cargo ba as it sits in...
Interior view of the Space Shuttle Endeavour forward flight deck. InterActive Interior view of the Space Shuttle Endeavour forward flight deck. Interior view of the Space Shuttle Endeavour aft flight deck.
Endeavour Forward Flight DeckInterActive Endeavour Forward Flight Deck Interior view of the Space Shuttle Endeavour forward flight deck.
Atlas V with Mars Science Laboratory payloadInterActive Atlas V with Mars Science Laboratory payload The rover Curiosity will carry the biggest, most advanced suite of instruments for scientific...
Curiosity roverInterActive Curiosity rover NASA's Mars Science Laboratory Curiosity rover, a mobile robot for investigating Mars' past or...
Curiosity roverInterActive Curiosity rover NASA's Mars Science Laboratory Curiosity rover, a mobile robot for investigating Mars' past or...
Gravity Recovery and Interior LaboratoryInterActive GRAIL The Gravity Recovery and Interior Laboratory mission's primary science objectives will be to...
Atlas V AV-029InterActive Atlas V AV-029 ULA Atlas V number AV-029 reaches launch pad on August 4th, 2011. In less than 1 day this Atlas...
Atlas V up closeInterActive Atlas V up close Get to know the Atlas V up close. Explore the rivets in this 74.62 megapixel image of the Atlas...
JUNO Atlas VInterActive JUNO Atlas V ULA Atlas V with the JUNO probe sitting atop at Cape Canaveral Air Force Station is ready for...
Atlantis at wheels stop on runway 15InterActive Atlantis on runway Space Shuttle Atlantis returned to Earth in the predawn hours of July 21st, 2011. Marking the...
Atlantis at wheels stop on runway 15InterActive Atlantis at wheels stop on runway 15 Space Shuttle Atlantis returned to Earth in the predawn hours of July 21st, 2011. Marking the...
Atlantis and towerInterActive Atlantis and tower Space shuttle Atlantis waits to receive payload for the final space shuttle mission STS-135,...
Atlantis payload preparationsInterActive Atlantis payload preparations Space shuttle Atlantis at pad 39A. The payload canister can be seen lifted in to position to...
Walk with the astronautsInterActive Walk with the astronauts A view of the 195ft level of the fixed service structure. This where the astronauts arrive at...
Last Space Shuttle prepares for launchInterActive Last Space Shuttle prepares for launch A close in look at space shuttle Atlantis on June 17th. Launch preparations are on going for...
The last space shuttle to be on the launch padInterActive The last space shuttle to be on the launch pad Space shuttle Atlantis, the last space shuttle to flight begins launch prepartions at pad 39A...
Last space shuttle arrives at launch padInterActive Last space shuttle arrives at launch pad Space shuttle Atlantis is seen here from the top of the rotating service structure the moring...
The last space shuttle has left the buildingInterActive The last space shuttle has left the building Space shuttle Atlantis rolls out of the Vehicle Assembly Building for the last time on the...
Space Shuttle Atlantis prepared to rollout to pad   InterActive Space Shuttle Atlantis prepared to rollout to pad Space shuttle Atlantis complete with the solid rocket boosters and external tank that will...
HiRes Atlantis hanging in VABInterActive HiRes Atlantis hanging in VAB HiRes image of Space Shuttle Atlantis hanging in the Vehical Assembly Building. This shot was...
Atlantis vertical from VAB Level 5InterActive Atlantis vertical from VAB Level 5 Space Shuttle Atlantis after being lifted into the verticle position before being mated to the...
Atlantis verticalInterActive Atlantis vertical Space Shuttle Atlantis hangs vertical before removing the rear hoist and lifting it for the...
Atlantis rolling verticalInterActive Atlantis rolling vertical Here Space Shuttle Atlantis is almost vertical being positioned to soon be mated to the...
Atlantis hanging in VABInterActive Atlantis hanging in VAB Space Shuttle Atlantis is seen here hanging about 10 feet above the VAB floor. It has justed...
Endeavour at nightInterActive Endeavour at night Space shuttle Endeavour seen here at night as launch preparation continue for the first launch...
Atlantis rolling over to VAB for final missionInterActive Atlantis rolling over to VAB for final mission Space Shuttle Atlantis rolling over the VAB for the last time. Atlantis is scheduled to be the...
Atlantis outside VAB for employee photosInterActive Atlantis outside VAB for employee photos Space shuttle Atlantis, the last space shuttle, pauses during rollover from the OPF to the VAB...
Hi Resolution image of the last space shuttleInterActive Hi Resolution image of the last space shuttle Hi Resolution composit image of the last space shuttle, Atlantis, as it sits atop the transport...
Atlantis in the VABInterActive Atlantis in the VAB Nice 360 degree view of the VAB with Atlantis being preped for the Lift and Mate procedure
Atlantis on the sled in VABInterActive Atlantis on the sled in VAB Explore the VAB with Space Shuttle Atlantis on the sled after rollover to the VAB jst before...
Atlantis being attached to slingInterActive Atlantis being attached to sling Full 360 degree panorama from inside the VAB as Space Shuttle Atlantis is attached to the sling...
Endeavour after RSS retractionInterActive Endeavour after RSS retraction Hi-Res image of Space Shuttle Endeavour on the launch pad 39A minutes after the RSS was...
The Mound STS-134 4/29 AttemptInterActive The Mound STS-134 4/29 Attempt This a 360 degree panorama from the mound of the KSC media center. This was the scence about an...
Alpha Magnetic Spectrometer (AMS)InterActive Alpha Magnetic Spectrometer (AMS) The Alpha Magnetic Spectrometer-2, a particle physics detector designed to search for various...
AMS in the SSPFInterActive AMS in the SSPF The Alpha Magnetic Spectrometer-2, a particle physics detector designed to search for various...
Here is Space Shuttle Endeavour just after sunriseInterActive Here is Space Shuttle Endeavour just after sunrise Here is Space Shuttle Endeavour just after sunrise the morning it arrived from the VAB. How...
Endeavour in the VABInterActive Endeavour in the VAB Space Shuttle Endeavour sitting stacked and ready atop the crawler to rollout the launch pad.
Endeavour in the VABInterActive Endeavour in the VAB Space Shuttle Endeavour sitting stacked and ready atop the crawler to rollout the launch pad.
Space Shuttle Discovery final towoverInterActive Space Shuttle Discovery final towover View of Space Shuttle Discovery 4 hours after returning to Earth for the last time. Discovery...
Space Shuttle Discovery Final LaunchInterActive Space Shuttle Discovery Final Launch This a 360 degree panorama taken 3 mile from the launch pad capturing the final lift off of...
Space shuttle Discovery final launchInterActive Space shuttle Discovery final launch This a 360 degree panorama taken 3 mile from the launch pad capturing the final lift off of...
Discovery at NightInterActive Discovery at Night This a panorama of Space Shuttle Discovery shortly after RSS retraction on 11/3/2010 preparing...
GRIP DC-8 PanoramaInterActive GRIP DC-8 Panorama Interior of forward section of NASA GRIP aircraft while configured for studding hurricane...
GRIP DC-8 InteriorInterActive GRIP DC-8 Interior Interior of forward section of NASA GRIP aircraft while configured for studding hurricane...
NASA GRIP DC-8InterActive NASA GRIP DC-8 The NASA DC-8 is a four-engine jet transport that has been highly modified to support the...
Endeavour on padInterActive Endeavour ready for launch HiRes image of Endeavour at Pad 39A
AMS-2 Antimatter TelescopeInterActive AMS-2 Antimatter Telescope Explore the SSPF and ESA's Antimatter Telescope. 360 rotating,zoomable Panorama!
Spectacular ultra hi-rez interactive shot of the Space Shuttle Endeavour on the launch pad for the last timeInterActive Explore LC-39A !! Spectacular ultra hi-rez interactive shot of the Space Shuttle Endeavour on the launch pad for...